B2B Delivery and Requirements Alignment
When AI projects fail in B2B settings, it's usually not because the model isn't strong enough but because requirements weren't aligned, acceptance criteria were vague, or the production environment wasn't understood. This page collects the methods an engineer needs when working directly with customers.
Core concepts
| Concept | Meaning |
|---|---|
| POC (proof of concept) | Proving the approach works on the customer's real samples within a limited scope, usually 2–4 weeks |
| Acceptance criteria | Measurable pass conditions written into the contract or requirements document (accuracy, processing time, coverage) |
| On-premises deployment | Deployed in the customer's data center or cloud account, often with network isolation, domestic-platform requirements and no direct access to public model APIs |
| Deliverables | The system itself + deployment docs + user manual + evaluation report + operations handover |
| Change management | Requirement changes are confirmed in writing, with their impact on schedule and acceptance assessed |
How it works: how AI projects differ from traditional B2B projects
| Dimension | Traditional systems | AI systems |
|---|---|---|
| Determinism of results | Clear rules; right is right | Probabilistic; you must agree on "what accuracy counts as passing" |
| Acceptance method | Test feature by feature | An eval set: samples + reference answers confirmed by both sides |
| Requirement boundaries | A feature list | Also agree on "what happens when the AI can't do it" (human takeover, fallbacks) |
| Data | Entered by the customer | The customer's historical data determines quality, so get real samples as early as possible |
| Cost | Mostly one-off development | Model calls are billed continuously, so agree on a cost cap or billing model |
In practice: the flow of a requirements engagement
1. Interviews: who the users are, how they work today, pain points, what success looks like
2. Get samples: at least 30–100 real (anonymized) records covering typical and difficult cases
3. Quick validation: within 1–3 days, produce a first round of results on the samples so the customer sees "how far this can go"
4. Write a requirements confirmation sheet: scope, input/output formats, acceptance eval set, accuracy target, what's out of scope
5. Iterate: weekly demos + evaluation reports, analyzing failure cases one by one
6. Go live: gradual rollout → full rollout, lowering the human review ratio step by step
7. Hand over: docs, monitoring dashboards, incident runbookRequirements confirmation sheet template (key items)
| Item | Example |
|---|---|
| Business goal | Automatically extract key contract fields, reducing manual data entry |
| Input scope | Text PDFs and scans, Chinese, ≤ 50 pages; no handwriting |
| Output format | A JSON field list + push to the customer's ERP API |
| Acceptance eval set | 100 samples with reference answers confirmed by both sides |
| Acceptance metrics | Key field accuracy ≥ 95%, ≤ 60 seconds per document |
| Failure handling | Low-confidence results go to the human review queue |
| Out of scope | Legal judgment of contract risk, English contracts |
| Deployment environment | Inside the customer's cloud account; model APIs accessed through a customer-approved proxy |
On-premises deployment checklist
- Can the environment reach public model APIs? If not, which self-hosted model, and what GPUs are needed?
- Operating system, CPU architecture (x86 / ARM), whether a domestic-platform environment is required
- Whether Docker is allowed; how images get in (offline image bundles)
- Use the customer's existing database and object storage, or bring your own
- Whether the account system must integrate with the customer's SSO / LDAP
- Whether logs can leave the network, and how remote troubleshooting works (bastion host, screen-sharing calls)
Common pitfalls
- Agreeing on accuracy verbally: without an eval set, both sides argue about "is it accurate" at acceptance.
- Getting samples too late: real data only arrives after development, and quality drops sharply.
- Demoing with cherry-picked samples: difficult samples expose problems after launch and trust suffers.
- No agreement on "what happens when it can't do it": the customer assumes the AI is fully automatic, when in reality human review is needed.
- Ignoring the deployment environment: development relied on public model APIs that the customer's internal network can't reach.
- No written record of requirement changes: when the schedule slips, responsibility is unclear.
Common interview questions
- Tell me about a time you worked out requirements with a customer: what they first asked for, what you finally delivered, and how you aligned along the way.
- How do you set acceptance criteria for an AI project? What if the customer demands 100% accuracy?
- The customer's environment can't reach public model APIs. How do you deliver?
- After launch the customer says "it's not accurate". What's your process?
- When requirements change frequently, how do you control scope and schedule?
Key points for answers: turn "is it accurate" into numbers with an eval set; write "hand over to a human when it can't do it" into the plan; replace arguments with failure-case analysis; confirm changes in writing.
How it relates to my projects
- AI Document Review Pipeline: the scenario itself is B2B delivery. Following this page, write a "requirements confirmation sheet" and an "evaluation report" into the project README as evidence of B2B skills in interviews.
- Human-in-the-Loop Takeover: the technical implementation of "what happens when it can't do it".
- Prompt Versioning and Evaluation: how to build the acceptance eval set.
Sources
- This page is a general summary of project delivery methods and doesn't cite a single authoritative source; the specific constraints of on-premises deployment vary by customer and should be confirmed by surveying the actual environment.