B2B Delivery and Requirements Alignment ​

When AI projects fail in B2B settings, it's usually not because the model isn't strong enough but because requirements weren't aligned, acceptance criteria were vague, or the production environment wasn't understood. This page collects the methods an engineer needs when working directly with customers.

Core concepts ​

ConceptMeaning
POC (proof of concept)Proving the approach works on the customer's real samples within a limited scope, usually 2–4 weeks
Acceptance criteriaMeasurable pass conditions written into the contract or requirements document (accuracy, processing time, coverage)
On-premises deploymentDeployed in the customer's data center or cloud account, often with network isolation, domestic-platform requirements and no direct access to public model APIs
DeliverablesThe system itself + deployment docs + user manual + evaluation report + operations handover
Change managementRequirement changes are confirmed in writing, with their impact on schedule and acceptance assessed

How it works: how AI projects differ from traditional B2B projects ​

DimensionTraditional systemsAI systems
Determinism of resultsClear rules; right is rightProbabilistic; you must agree on "what accuracy counts as passing"
Acceptance methodTest feature by featureAn eval set: samples + reference answers confirmed by both sides
Requirement boundariesA feature listAlso agree on "what happens when the AI can't do it" (human takeover, fallbacks)
DataEntered by the customerThe customer's historical data determines quality, so get real samples as early as possible
CostMostly one-off developmentModel calls are billed continuously, so agree on a cost cap or billing model

In practice: the flow of a requirements engagement ​

1. Interviews: who the users are, how they work today, pain points, what success looks like
2. Get samples: at least 30–100 real (anonymized) records covering typical and difficult cases
3. Quick validation: within 1–3 days, produce a first round of results on the samples so the customer sees "how far this can go"
4. Write a requirements confirmation sheet: scope, input/output formats, acceptance eval set, accuracy target, what's out of scope
5. Iterate: weekly demos + evaluation reports, analyzing failure cases one by one
6. Go live: gradual rollout → full rollout, lowering the human review ratio step by step
7. Hand over: docs, monitoring dashboards, incident runbook

Requirements confirmation sheet template (key items)

ItemExample
Business goalAutomatically extract key contract fields, reducing manual data entry
Input scopeText PDFs and scans, Chinese, ≤ 50 pages; no handwriting
Output formatA JSON field list + push to the customer's ERP API
Acceptance eval set100 samples with reference answers confirmed by both sides
Acceptance metricsKey field accuracy ≥ 95%, ≤ 60 seconds per document
Failure handlingLow-confidence results go to the human review queue
Out of scopeLegal judgment of contract risk, English contracts
Deployment environmentInside the customer's cloud account; model APIs accessed through a customer-approved proxy

On-premises deployment checklist

  • Can the environment reach public model APIs? If not, which self-hosted model, and what GPUs are needed?
  • Operating system, CPU architecture (x86 / ARM), whether a domestic-platform environment is required
  • Whether Docker is allowed; how images get in (offline image bundles)
  • Use the customer's existing database and object storage, or bring your own
  • Whether the account system must integrate with the customer's SSO / LDAP
  • Whether logs can leave the network, and how remote troubleshooting works (bastion host, screen-sharing calls)

Common pitfalls ​

  1. Agreeing on accuracy verbally: without an eval set, both sides argue about "is it accurate" at acceptance.
  2. Getting samples too late: real data only arrives after development, and quality drops sharply.
  3. Demoing with cherry-picked samples: difficult samples expose problems after launch and trust suffers.
  4. No agreement on "what happens when it can't do it": the customer assumes the AI is fully automatic, when in reality human review is needed.
  5. Ignoring the deployment environment: development relied on public model APIs that the customer's internal network can't reach.
  6. No written record of requirement changes: when the schedule slips, responsibility is unclear.

Common interview questions ​

  1. Tell me about a time you worked out requirements with a customer: what they first asked for, what you finally delivered, and how you aligned along the way.
  2. How do you set acceptance criteria for an AI project? What if the customer demands 100% accuracy?
  3. The customer's environment can't reach public model APIs. How do you deliver?
  4. After launch the customer says "it's not accurate". What's your process?
  5. When requirements change frequently, how do you control scope and schedule?

Key points for answers: turn "is it accurate" into numbers with an eval set; write "hand over to a human when it can't do it" into the plan; replace arguments with failure-case analysis; confirm changes in writing.

How it relates to my projects ​